The project has a total length of 77.8 kilometers and a total designed water intake capacity of 480,000 cubic meters per day. The project uses a fixed pump station on the shore to draw water from the main stream of the water source, lays underground pipelines, and sets up a first-level pressurized pump station in the middle. The designed flow rate of the water intake pump station is 5.9 cubic meters/second, and the designed flow rate of the pressurized pump station is 4.7 cubic meters/second.